The Public Works Nerds

St Paul Regional Water Service's Water Treatment Plant Overhaul Project Using Progressive Design Build - A Conversation with Pat Shea

• Marc Culver, PE and Mike Spack, PE • Season 1 • Episode 7

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 1:00:47

Send us Fan Mail

Pat Shea, General Manager of the St Paul Regional Water Service spends time with us nerds to talk about their mammoth Water Treatment Plant project including the use of Progressive Design Build to deliver the project. Pat also touches on the issue of lead service line replacement and how SPRWS's surface water source is unique in the nation.

FURTHER RESOURCES
Project Presentation
https://drive.google.com/file/d/16udJIAX4DyptRJVqQD3Ntp0LC9bIa76n/view?usp=sharing

Design Build Institute of America - Primer on Progressive Design Build Process
https://dbia.org/wp-content/uploads/2018/05/Primer-Progressive-Design-Build.pdf

St Paul Regional Water Services website
https://www.stpaul.gov/departments/saint-paul-regional-water-services



People on this episode